Wynmoor, the guard-gated 55-and-over community in Coconut Creek, is a village of low-rise condominium buildings built from the late 1970s. Demolition inside a unit there starts with the association, not the city: its approval, its contractor rules and its working hours.

Condominium interiors of that age raise the asbestos question before a ceiling or floor is opened. Broward County's asbestos program treats condominiums as larger projects, allowing itself up to two weeks to review those filings against one week for residential buildings of four units or fewer.

The city's Building Department, part of Resilient Design and Development, requires a permit for alterations, replacements or removals of existing structures. Contractors submit through ePermits using unlocked PDF documents; owner-builders apply in person.

For a condominium job we start with the association manager: elevator protection where there is one, the debris route, parking for the container, and the days work is allowed. The permit follows that plan.

The permit in Coconut Creek

City of Coconut Creek Building Department, Resilient Design and Development

A building permit is required for new construction and for alterations, replacements or removals of existing structures. Contractors submit through ePermits, and Broward County permits run through ePermitsOneStop.

Official source

General information, not legal advice. When Romco is hired, we pull the permit as the contractor of record. Broward permit basics

What we quote in Coconut Creek

Any type of demolition, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for a shed and for a building.

  1. Send the address and the scope

    Call, or use the quote form with photos or drawings. Tell us what has to go and what has to stay.

  2. We walk the site

    We look at the structure, the utilities, access for equipment and trucks, and what sits next door.

  3. Written scope and quote

    The quote names what is removed, what is protected, what is hauled away, and what depends on survey results.

  4. Surveys, permit and disconnects

    Asbestos survey where required, utility disconnects, and the demolition permit from your city's building department.

  5. Demolition and haul-off

    Work follows the agreed sequence. Debris is hauled to permitted disposal facilities, with the load records kept.

  6. Final inspection

    The building department closes the permit. You get a clear site, or the shell you asked for.

Questions

Demolition in Coconut Creek

Can I gut my condominium unit in Coconut Creek without the association?

No. The association's approval and rules come first, and the city still requires a permit for removal work. In an older building, an asbestos survey belongs before the first ceiling or floor is opened. We coordinate all three in that order.

What does a demolition cost?

Every job is quoted from a site visit, or from photos and drawings when that is enough to see the scope. The number depends on what the building is made of, its size and height, what the asbestos survey finds, which utilities must be disconnected, access for equipment, how close the neighbors are, what stays and what goes, and where the debris is hauled. We do not publish prices, because two jobs that look alike rarely are.

What happens with asbestos before demolition?

The building is surveyed first by an independent licensed consultant, because federal rules require a thorough asbestos inspection before a regulated demolition and the county's notice depends on it. If the survey finds asbestos that the work will disturb, a licensed abatement firm removes it. Romco coordinates both; we are not an abatement contractor.

How long does a demolition take?

We do not quote durations before the facts are in. The schedule depends on permit review in your city, how quickly the utility disconnect letters arrive, what the asbestos survey finds and any notice period that follows, association approvals, and the size and construction of the building. Once those are known, we give you a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Miramar · Weston · Tamarac · Margate · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point · Parkland

Any type, any size, anywhere in Broward County

Send the address and what has to go. We will price the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One interior wall or a whole building: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote