Skip to content

Davie, Broward County

Demolition in Davie

Davie still zones for horses, and a lot that holds a house can also hold a barn, a run-in shed or a mobile home. The town treats an old mobile home as a demolition: removing it needs a demolition permit before a permit for a replacement unit can even be applied for.

The town keeps a trail system of more than 165 miles, much of it built for riders, and many western lots are zoned to keep horses at home. That shapes the job. Fencing and paddocks often stay, truck routes are planned around trails that riders use, and the machine works inside a smaller footprint than the lot suggests.

Davie's demolition checklist routes every application through structural, electrical, plumbing and mechanical review, with planning and zoning, engineering and landscaping reviews where they apply. It asks for a signed and sealed survey, or a survey affidavit when an older survey still shows the property as it stands, plus ownership records from the Broward County Property Appraiser.

The permit in Davie

Town of Davie Building Division

The Building Division's demolition checklist lists the required applications, review stops, survey rules and the Notice of Commencement threshold. Earthwork after a demolition, such as fill or excavation, can need a separate site development permit.

Official source

General information, not legal advice. When Romco is hired, we pull the permit as the contractor of record. Broward permit basics

What we quote in Davie

Any type of demolition, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for a shed and for a building.

  1. Send the address and the scope

    Call, or use the quote form with photos or drawings. Tell us what has to go and what has to stay.

  2. We walk the site

    We look at the structure, the utilities, access for equipment and trucks, and what sits next door.

  3. Written scope and quote

    The quote names what is removed, what is protected, what is hauled away, and what depends on survey results.

  4. Surveys, permit and disconnects

    Asbestos survey where required, utility disconnects, and the demolition permit from your city's building department.

  5. Demolition and haul-off

    Work follows the agreed sequence. Debris is hauled to permitted disposal facilities, with the load records kept.

  6. Final inspection

    The building department closes the permit. You get a clear site, or the shell you asked for.

Questions

Demolition in Davie

Does removing an old mobile home in Davie need a permit?

Yes. The town's mobile home checklist states that removing an existing unit requires a demolition permit before a permit for a new mobile home can be applied for. Utilities to the unit are disconnected first, and the removal is inspected like any other demolition.

What does a demolition cost?

Every job is quoted from a site visit, or from photos and drawings when that is enough to see the scope. The number depends on what the building is made of, its size and height, what the asbestos survey finds, which utilities must be disconnected, access for equipment, how close the neighbors are, what stays and what goes, and where the debris is hauled. We do not publish prices, because two jobs that look alike rarely are.

What happens with asbestos before demolition?

The building is surveyed first by an independent licensed consultant, because federal rules require a thorough asbestos inspection before a regulated demolition and the county's notice depends on it. If the survey finds asbestos that the work will disturb, a licensed abatement firm removes it. Romco coordinates both; we are not an abatement contractor.

How long does a demolition take?

We do not quote durations before the facts are in. The schedule depends on permit review in your city, how quickly the utility disconnect letters arrive, what the asbestos survey finds and any notice period that follows, association approvals, and the size and construction of the building. Once those are known, we give you a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Sunrise · Deerfield Beach · Miramar · Weston · Tamarac · Margate · Coconut Creek · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point · Parkland

Any type, any size, anywhere in Broward County

Send the address and what has to go. We will price the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One interior wall or a whole building: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote