Skip to content

Oakland Park, Broward County

Demolition in Oakland Park

Oakland Park was first incorporated in 1925 as Floranada, a boom-era resort plan that went bankrupt after the 1926 hurricane, and it reincorporated under its current name in 1929. The lots that history left, along the Middle River and the Dixie Highway corridor, hold some of Broward's older housing.

Older housing means older materials. Postwar houses routinely carry asbestos in floor tile, mastic and textured ceilings, and lead in paint, so the survey sets the sequence before any permit is drawn.

Work in the public right of way is permitted separately, and the city may require a meeting before it starts. A demolition that stages a container or equipment on the swale or street should confirm those steps with the city's Engineering division first.

Lots that back onto the Middle River or its canals have a seawall to protect. We record its condition before work and keep heavy loads away from it.

The permit in Oakland Park

City of Oakland Park Building and Permitting Services Division

The division sits within the Building and Community Services Department. Online submittal covers selected residential permits; other applications are filed in person on the current Broward County uniform application.

Official source

General information, not legal advice. When Romco is hired, we pull the permit as the contractor of record. Broward permit basics

What we quote in Oakland Park

Any type of demolition, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for a shed and for a building.

  1. Send the address and the scope

    Call, or use the quote form with photos or drawings. Tell us what has to go and what has to stay.

  2. We walk the site

    We look at the structure, the utilities, access for equipment and trucks, and what sits next door.

  3. Written scope and quote

    The quote names what is removed, what is protected, what is hauled away, and what depends on survey results.

  4. Surveys, permit and disconnects

    Asbestos survey where required, utility disconnects, and the demolition permit from your city's building department.

  5. Demolition and haul-off

    Work follows the agreed sequence. Debris is hauled to permitted disposal facilities, with the load records kept.

  6. Final inspection

    The building department closes the permit. You get a clear site, or the shell you asked for.

Questions

Demolition in Oakland Park

Does a demolition in Oakland Park need anything for the street or swale?

If a container, equipment or staging sits in the public right of way, expect a separate right-of-way permit, and the city may require a meeting before work starts. Confirm with the Engineering division. We stage on the lot where it fits and file for the right of way where it does not.

What does a demolition cost?

Every job is quoted from a site visit, or from photos and drawings when that is enough to see the scope. The number depends on what the building is made of, its size and height, what the asbestos survey finds, which utilities must be disconnected, access for equipment, how close the neighbors are, what stays and what goes, and where the debris is hauled. We do not publish prices, because two jobs that look alike rarely are.

What happens with asbestos before demolition?

The building is surveyed first by an independent licensed consultant, because federal rules require a thorough asbestos inspection before a regulated demolition and the county's notice depends on it. If the survey finds asbestos that the work will disturb, a licensed abatement firm removes it. Romco coordinates both; we are not an abatement contractor.

How long does a demolition take?

We do not quote durations before the facts are in. The schedule depends on permit review in your city, how quickly the utility disconnect letters arrive, what the asbestos survey finds and any notice period that follows, association approvals, and the size and construction of the building. Once those are known, we give you a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Miramar · Weston · Tamarac · Margate · Coconut Creek · Lauderhill · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point · Parkland

Any type, any size, anywhere in Broward County

Send the address and what has to go. We will price the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One interior wall or a whole building: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote