Condominium towers line Pompano Beach's shore on A1A, and each one of three or more stories falls under Florida's milestone inspection law. When a milestone report calls for concrete repair, the first trade on site is selective demolition, opening finishes and damaged concrete so the engineer can see the steel.

The milestone law, passed in 2022 as SB 4-D, requires condominium and cooperative buildings of three or more stories to have a structural inspection by an architect or engineer. As amended in 2023, the first inspection falls due by the year a building turns 30 and repeats every ten years, and the local building official may require it at 25 where conditions such as salt air call for it. The inspection is structural; it does not certify that a building meets the current Florida Building Code.

Demolition inside an occupied tower is a different job from a teardown. Residents stay, elevators are shared, debris leaves through one loading area, and the association sets the working hours. We plan the sequence floor by floor with the association manager and the engineer of record, who keeps every structural decision.

Inland, Pompano's single-family streets include canal lots off the Intracoastal and older block houses, where a teardown follows the ordinary order: survey, utility disconnects, permit, demolition, final inspection.

The permit in Pompano Beach

City of Pompano Beach Building Inspections Division

The division takes permit applications online, with fees and inspections handled through the city's Click2Gov system. Through ePermitsOneStop, Pompano Beach customers can apply for the city permit and associated Broward County permits together.

Official source

General information, not legal advice. When Romco is hired, we pull the permit as the contractor of record. Broward permit basics

What we quote in Pompano Beach

Any type of demolition, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for a shed and for a building.

  1. Send the address and the scope

    Call, or use the quote form with photos or drawings. Tell us what has to go and what has to stay.

  2. We walk the site

    We look at the structure, the utilities, access for equipment and trucks, and what sits next door.

  3. Written scope and quote

    The quote names what is removed, what is protected, what is hauled away, and what depends on survey results.

  4. Surveys, permit and disconnects

    Asbestos survey where required, utility disconnects, and the demolition permit from your city's building department.

  5. Demolition and haul-off

    Work follows the agreed sequence. Debris is hauled to permitted disposal facilities, with the load records kept.

  6. Final inspection

    The building department closes the permit. You get a clear site, or the shell you asked for.

Questions

Demolition in Pompano Beach

Our Pompano Beach condominium needs repairs after its milestone inspection. Is part of that demolition?

Usually, yes. Concrete and structural repair starts with selective demolition, which removes finishes, coatings and damaged concrete so the engineer can inspect and specify the repair. We quote that scope against the engineer's documents and coordinate it with the association. The structural design stays with the engineer of record.

What does a demolition cost?

Every job is quoted from a site visit, or from photos and drawings when that is enough to see the scope. The number depends on what the building is made of, its size and height, what the asbestos survey finds, which utilities must be disconnected, access for equipment, how close the neighbors are, what stays and what goes, and where the debris is hauled. We do not publish prices, because two jobs that look alike rarely are.

What happens with asbestos before demolition?

The building is surveyed first by an independent licensed consultant, because federal rules require a thorough asbestos inspection before a regulated demolition and the county's notice depends on it. If the survey finds asbestos that the work will disturb, a licensed abatement firm removes it. Romco coordinates both; we are not an abatement contractor.

How long does a demolition take?

We do not quote durations before the facts are in. The schedule depends on permit review in your city, how quickly the utility disconnect letters arrive, what the asbestos survey finds and any notice period that follows, association approvals, and the size and construction of the building. Once those are known, we give you a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Miramar · Weston · Tamarac · Margate · Coconut Creek · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point · Parkland

Any type, any size, anywhere in Broward County

Send the address and what has to go. We will price the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One interior wall or a whole building: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote