Weston, Broward County

Demolition in Weston

Weston began as Arvida's master-planned community, first called Indian Trace, and became a city in 1996, with Bonaventure joining in 1997. Its neighborhoods were built to a plan and are governed by associations, so a demolition here answers to two reviewers: the city and the HOA.

The first Arvida homes were finished by 1984, so most of Weston's housing is young by Broward standards. Full teardowns are less common than interior gut-outs, pool removals and demolition ahead of an addition, and each of those touches the exterior or the lot in a way an association may review.

Where the association has architectural review, its written approval comes first. The city permit does not substitute for it, and an HOA stop-work letter halfway through a job costs more than the wait would have.

Weston Permitting Services takes applications through the city's e-Permits portal. Contractors must be registered with the city, with current insurance and licensing documents on file, and applications are signed and notarized for each discipline of work.

The permit in Weston

City of Weston Building Code Services (Weston Permitting Services)

Applications go through the city's e-Permits portal, and contractors must be registered with the city before applying. Each discipline of work needs its own signed and notarized application.

Official source

General information, not legal advice. When Romco is hired, we pull the permit as the contractor of record. Broward permit basics

What we quote in Weston

Any type of demolition, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for a shed and for a building.

  1. Send the address and the scope

    Call, or use the quote form with photos or drawings. Tell us what has to go and what has to stay.

  2. We walk the site

    We look at the structure, the utilities, access for equipment and trucks, and what sits next door.

  3. Written scope and quote

    The quote names what is removed, what is protected, what is hauled away, and what depends on survey results.

  4. Surveys, permit and disconnects

    Asbestos survey where required, utility disconnects, and the demolition permit from your city's building department.

  5. Demolition and haul-off

    Work follows the agreed sequence. Debris is hauled to permitted disposal facilities, with the load records kept.

  6. Final inspection

    The building department closes the permit. You get a clear site, or the shell you asked for.

Questions

Demolition in Weston

Does my Weston HOA need to approve a demolition?

If the association has architectural review, plan on it for any exterior change, and many associations also set rules for contractor hours and container placement. The city permit and the HOA approval are separate. We ask for the association's written approval before we file with the city.

What does a demolition cost?

Every job is quoted from a site visit, or from photos and drawings when that is enough to see the scope. The number depends on what the building is made of, its size and height, what the asbestos survey finds, which utilities must be disconnected, access for equipment, how close the neighbors are, what stays and what goes, and where the debris is hauled. We do not publish prices, because two jobs that look alike rarely are.

What happens with asbestos before demolition?

The building is surveyed first by an independent licensed consultant, because federal rules require a thorough asbestos inspection before a regulated demolition and the county's notice depends on it. If the survey finds asbestos that the work will disturb, a licensed abatement firm removes it. Romco coordinates both; we are not an abatement contractor.

How long does a demolition take?

We do not quote durations before the facts are in. The schedule depends on permit review in your city, how quickly the utility disconnect letters arrive, what the asbestos survey finds and any notice period that follows, association approvals, and the size and construction of the building. Once those are known, we give you a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Miramar · Tamarac · Margate · Coconut Creek · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point · Parkland

Any type, any size, anywhere in Broward County

Send the address and what has to go. We will price the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One interior wall or a whole building: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote