Skip to content

Miramar, Broward County

Demolition in Miramar

Miramar's demolition package carries two affidavits most owners do not expect. One is an Affidavit of Awareness of Homeowner's Association, required on residential jobs even where no HOA exists. The other is a Construction Debris Removal Affidavit, because city ordinance sends demolition debris to the city's vendor, Waste Pro of Florida.

The city began in 1955 as a small grid between SW 64th Avenue and University Drive and spread west over the following decades. The east side holds the older block houses; the west is newer planned communities with associations and their own architectural review.

Owner-builders can pull a residential demolition permit in Miramar, but the city asks for a photo ID matching the property address, proof of ownership and confirmation of a homestead exemption. If a contractor is hired, the contractor pulls the permit. Boundary surveys must be original, scalable and less than seven years old.

Commercial demolition plans go in as four sets signed and sealed by an engineer or registered architect. We build the package to that checklist and file once every affidavit is signed.

The permit in Miramar

City of Miramar Building Division, Building, Planning and Zoning Department

The city's Demolition Application Package lists who may apply, the plan and survey requirements, the Broward County asbestos certificate and the mandatory debris removal affidavit. Licensed contractors must be registered with the Building Division.

Official source

General information, not legal advice. When Romco is hired, we pull the permit as the contractor of record. Broward permit basics

What we quote in Miramar

Any type of demolition, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for a shed and for a building.

  1. Send the address and the scope

    Call, or use the quote form with photos or drawings. Tell us what has to go and what has to stay.

  2. We walk the site

    We look at the structure, the utilities, access for equipment and trucks, and what sits next door.

  3. Written scope and quote

    The quote names what is removed, what is protected, what is hauled away, and what depends on survey results.

  4. Surveys, permit and disconnects

    Asbestos survey where required, utility disconnects, and the demolition permit from your city's building department.

  5. Demolition and haul-off

    Work follows the agreed sequence. Debris is hauled to permitted disposal facilities, with the load records kept.

  6. Final inspection

    The building department closes the permit. You get a clear site, or the shell you asked for.

Questions

Demolition in Miramar

Why does Miramar ask for an HOA affidavit when my house is not in an HOA?

The city requires the Affidavit of Awareness of Homeowner's Association on every residential demolition application, whether or not the property sits in an association. It records that the owner has considered association rules. Sign it either way, and where an association exists, get its written approval as well.

What does a demolition cost?

Every job is quoted from a site visit, or from photos and drawings when that is enough to see the scope. The number depends on what the building is made of, its size and height, what the asbestos survey finds, which utilities must be disconnected, access for equipment, how close the neighbors are, what stays and what goes, and where the debris is hauled. We do not publish prices, because two jobs that look alike rarely are.

What happens with asbestos before demolition?

The building is surveyed first by an independent licensed consultant, because federal rules require a thorough asbestos inspection before a regulated demolition and the county's notice depends on it. If the survey finds asbestos that the work will disturb, a licensed abatement firm removes it. Romco coordinates both; we are not an abatement contractor.

How long does a demolition take?

We do not quote durations before the facts are in. The schedule depends on permit review in your city, how quickly the utility disconnect letters arrive, what the asbestos survey finds and any notice period that follows, association approvals, and the size and construction of the building. Once those are known, we give you a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Weston · Tamarac · Margate · Coconut Creek · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point · Parkland

Any type, any size, anywhere in Broward County

Send the address and what has to go. We will price the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One interior wall or a whole building: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote