Parkland, Broward County

Demolition in Parkland

On a Parkland estate lot, the neighbors hear about a demolition from the paperwork before they hear the machine. The city's residential demolition checklist requires a notification letter to adjacent owners, and that letter is where the job's relationship with the street begins.

For a remodel or partial demolition, Parkland requires the new plans and rebuilding applications before it issues the demolition permit. You cannot open the house first and design afterward; the replacement work has to be on file.

The checklist also calls for a vermin certificate from a licensed pest control company, the Broward County asbestos statement at submittal, a site plan, and a recorded Notice of Commencement when the job value is over the threshold. Where an association governs the lot, its approval sits beside the city permit.

The permit in Parkland

City of Parkland Development Services Department

Residential demolition applications follow the city's Residential Demolition Checklist and use the Broward County uniform application for each discipline. Owner-builders file the city's owner-builder affidavit.

Official source

General information, not legal advice. When Romco is hired, we pull the permit as the contractor of record. Broward permit basics

What we quote in Parkland

Any type of demolition, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for a shed and for a building.

  1. Send the address and the scope

    Call, or use the quote form with photos or drawings. Tell us what has to go and what has to stay.

  2. We walk the site

    We look at the structure, the utilities, access for equipment and trucks, and what sits next door.

  3. Written scope and quote

    The quote names what is removed, what is protected, what is hauled away, and what depends on survey results.

  4. Surveys, permit and disconnects

    Asbestos survey where required, utility disconnects, and the demolition permit from your city's building department.

  5. Demolition and haul-off

    Work follows the agreed sequence. Debris is hauled to permitted disposal facilities, with the load records kept.

  6. Final inspection

    The building department closes the permit. You get a clear site, or the shell you asked for.

Questions

Demolition in Parkland

Why must I submit rebuild plans before a partial demolition in Parkland?

The city's checklist requires new plans and rebuilding applications before it issues a demolition permit for a remodel or partial demolition. The city wants to see what the house becomes before any of it is removed. We coordinate the demolition scope with your architect so both applications describe the same line between what stays and what goes.

What does a demolition cost?

Every job is quoted from a site visit, or from photos and drawings when that is enough to see the scope. The number depends on what the building is made of, its size and height, what the asbestos survey finds, which utilities must be disconnected, access for equipment, how close the neighbors are, what stays and what goes, and where the debris is hauled. We do not publish prices, because two jobs that look alike rarely are.

What happens with asbestos before demolition?

The building is surveyed first by an independent licensed consultant, because federal rules require a thorough asbestos inspection before a regulated demolition and the county's notice depends on it. If the survey finds asbestos that the work will disturb, a licensed abatement firm removes it. Romco coordinates both; we are not an abatement contractor.

How long does a demolition take?

We do not quote durations before the facts are in. The schedule depends on permit review in your city, how quickly the utility disconnect letters arrive, what the asbestos survey finds and any notice period that follows, association approvals, and the size and construction of the building. Once those are known, we give you a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Miramar · Weston · Tamarac · Margate · Coconut Creek · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point

Any type, any size, anywhere in Broward County

Send the address and what has to go. We will price the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One interior wall or a whole building: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote